New ordinances can be viewed here before they are incorporated into this site. Got it!

MapLink™ | Procedures | Planned Unit Residential Developments

Hello! Content on this website is provided as a convenience and is for informational use only. Be sure to review the Terms of Use for all of the details related to your use of this website.
Accept
Back
Planned Unit Residential Developments
Approval procedures (R-1B and R-1C Districts):
(1) The Planning Board shall review all drawings and materials submitted and determine conformance with the standards of this chapter, the Township Master Plan, and Chapter 205, Land Subdivision and Site Plan Review, of the Code of the Township of Willingboro. Upon satisfaction that the submittal meets all requirements, the Planning Board may approve the planned unit residential development. The Planning Board shall, within 95 days after its receipt of such drawings and materials, approve or disapprove the proposed development.

(2) Site plan review. Before a planned unit residential development is approved, the applicant shall have submitted to the Planning Board a set of detailed plans showing lot and street arrangement, existing topography, proposed finished grades, proposed building locations, proposed fencing density patterns, site design, proposed landscaping, areas to be devoted to open space or public use, and elevations of proposed buildings. A preliminary site plan, sufficient in detail only to show intent, may be submitted by the developer for discussion with the Planning Board.

See § 370-29: Additional requirements and § 370-35: Additional requirements for complete, detailed information.