Approval procedures (R-1B and R-1C Districts):
(1) The Planning Board shall review all drawings and materials submitted and determine conformance with the standards of this chapter, the Township Master Plan, and Chapter
205, Land Subdivision and Site Plan Review, of the Code of the Township of Willingboro. Upon satisfaction that the submittal meets all requirements, the Planning Board may approve the planned unit residential development. The Planning Board shall, within 95 days after its receipt of such drawings and materials, approve or disapprove the proposed development.
(2) Site plan review. Before a planned unit residential development is approved, the applicant shall have submitted to the Planning Board a set of detailed plans showing lot and street arrangement, existing topography, proposed finished grades, proposed building locations, proposed fencing density patterns, site design, proposed landscaping, areas to be devoted to open space or public use, and elevations of proposed buildings. A preliminary site plan, sufficient in detail only to show intent, may be submitted by the developer for discussion with the Planning Board.
See
§ 370-29: Additional requirements and
§ 370-35: Additional requirements for complete, detailed information.